A mechanical contractor in Saskatoon consolidated three steel vendors into one — and cut their project timelines by two weeks.
Northern Mechanical installs process piping, structural steel, and mechanical systems for industrial plants across Saskatchewan. A typical project requires pipe, wide flange beam, plate, angle, and channel — often in multiple grades and sizes.
Before Brunswick, Darren Flett was managing three steel vendors and two external cutting shops per project. Coordinating deliveries across five suppliers meant that if any one was late, the whole job stalled. His estimator spent more time chasing purchase orders than estimating.
On a recent potash plant expansion, a missed delivery from one vendor pushed the schedule back nine days. The general contractor issued a back-charge. Darren decided something had to change.
"I was spending half my week on the phone with suppliers instead of running my business. Every project was a logistics puzzle that didn't need to exist."
Brunswick Steel assigned a dedicated account rep to Northern Mechanical and built a standing stock profile based on their typical project mix. When Darren sends a cut list, Brunswick pulls pipe, beam, plate, and angle from their own inventory, runs all processing in-house, and delivers the entire package on one truck.
The processing mix included plate burning, beam cutting to length, and tube laser work for pipe supports — all previously farmed out to separate shops. Brunswick's BÔS system gives Darren real-time order tracking so his site crews know exactly when material will arrive.

Northern Mechanical has completed six projects since switching to Brunswick. Average project timelines shortened by two weeks. Material costs dropped 18% thanks to consolidated pricing and eliminated rush charges.
Darren's estimator now spends time estimating rather than coordinating logistics. Northern Mechanical has not missed a single project deadline since making the switch.