    Case StudyMechanical ContractingSaskatoon, SK

    Northern Mechanical Builds Faster With Brunswick's Processing Mix

    A mechanical contractor in Saskatoon consolidated three steel vendors into one — and cut their project timelines by two weeks.

    Northern Mechanical Builds Faster With Brunswick's Processing Mix
    2 Weeks
    Shorter Project Timelines
    1 Vendor
    Replaced 3 Suppliers + 2 Shops
    18%
    Material Cost Reduction
    Zero
    Missed Deadlines Since Switch

    Too Many Vendors, Too Many Delays

    Northern Mechanical installs process piping, structural steel, and mechanical systems for industrial plants across Saskatchewan. A typical project requires pipe, wide flange beam, plate, angle, and channel — often in multiple grades and sizes.

    Before Brunswick, Darren Flett was managing three steel vendors and two external cutting shops per project. Coordinating deliveries across five suppliers meant that if any one was late, the whole job stalled. His estimator spent more time chasing purchase orders than estimating.

    On a recent potash plant expansion, a missed delivery from one vendor pushed the schedule back nine days. The general contractor issued a back-charge. Darren decided something had to change.

    "I was spending half my week on the phone with suppliers instead of running my business. Every project was a logistics puzzle that didn't need to exist."

    Darren Flett
    Owner, Northern Mechanical Ltd.

    Brunswick's Processing Mix: One Order, One Delivery

    Brunswick Steel assigned a dedicated account rep to Northern Mechanical and built a standing stock profile based on their typical project mix. When Darren sends a cut list, Brunswick pulls pipe, beam, plate, and angle from their own inventory, runs all processing in-house, and delivers the entire package on one truck.

    The processing mix included plate burning, beam cutting to length, and tube laser work for pipe supports — all previously farmed out to separate shops. Brunswick's BÔS system gives Darren real-time order tracking so his site crews know exactly when material will arrive.

    Pipe installation
    Industrial pipe installation at a Saskatchewan plant
    Staged material
    Beam and plate staged for delivery

    Two Weeks Back on Every Project

    Northern Mechanical has completed six projects since switching to Brunswick. Average project timelines shortened by two weeks. Material costs dropped 18% thanks to consolidated pricing and eliminated rush charges.

    Darren's estimator now spends time estimating rather than coordinating logistics. Northern Mechanical has not missed a single project deadline since making the switch.